Collection, analysis, report, support
Every conclusion should be traceable to the record it rests on.
- Step 1
Collection
Assemble the record and test its reliability.
- Contract documents and baseline programme
- Programme updates in native format
- Minutes, correspondence, progress reports
- Log of sources and gaps
- Step 2
Analysis
Select the appropriate method and reconstruct what actually happened.
- Reasoned choice of method (TIA, windows, as-planned vs as-built)
- As-built reconstruction from the record
- Critical path and total float per window
- Treatment of concurrency
- Step 3
Report
Present conclusions in a form that can be verified.
- Reasoned conclusions and stated assumptions
- Each fact referenced to its source
- Reproducible calculation appendices
- Format suited to the forum: negotiation, court, arbitration
- Step 4
Support
Stand behind the analysis through to adversarial scrutiny.
- Expert meetings
- Responses to submissions
- Critique of opposing expert reports
- Working sessions with counsel
Traceability. A delay analysis is only as good as the records behind it. Every date, duration and logic link adopted is referenced to an identified source.
Method follows the records. The choice between TIA, windows analysis and as-planned vs as-built depends on the programmes available, their reliability and the question to be answered. The choice is explained in the report, with reference to the SCL Delay and Disruption Protocol.
Stated assumptions. Where the record is incomplete, the assumptions made are set out and their effect on the conclusions is tested.
Independence. Conclusions follow from the analysis, not from the instructing party’s position. Scope and terms of engagement are agreed in writing.