Delay analysis and project controls

Four areas of practice, one standard: conclusions that stand up to scrutiny by the other side.

Site scheduling and coordination (OPC)

Planning, monitoring and coordination of works for an employer or a design team. In French practice this role is known as OPC (ordonnancement, pilotage, coordination).

  • master and detailed programmes;
  • progress monitoring, updates and variance analysis;
  • coordination meetings and action tracking;
  • early warning on critical path slippage.

Experience of retrospective analysis informs the forward view: keeping records as if every variance will one day need explaining.

Programme reviews

Testing a baseline, an update or a recovery programme before it is relied on for a decision or a claim.

  • logic: open ends, unjustified start-to-start and finish-to-finish links;
  • imposed constraints and negative float;
  • realism of durations and sequences against resources;
  • consistency between reported progress and actual dates;
  • continuity of the critical path from one update to the next.

The programme to hand is not always the best one: incomplete logic, irregular updates, inconsistent dates. Where that is so, I can also analyse the programme itself, to establish what can be relied on, what cannot, and what can be drawn from it.

Native Primavera P6 (XER) and MS Project files. Findings are set out in a written note, with critical issues ranked.

Delay and causation analysis

Identifying which events affected the critical path, quantifying their effect on completion, and establishing where responsibility lies.

The method is selected to suit the question, the available records and the contract, with reference to the SCL Delay and Disruption Protocol:

  • Time Impact Analysis (TIA): an event is modelled into the contemporaneous programme to assess its prospective effect;
  • Windows analysis: the project is divided into periods and the critical path is tracked window by window;
  • As-planned vs as-built: planned and actual dates are compared directly, where interim updates are incomplete;
  • Collapsed as-built: events attributable to one party are removed to establish the “but-for” completion date.

The analysis distinguishes excusable, compensable and concurrent delay, and sets out how float has been treated.

Deliverables: report, chronology of events, critical path per window, delay allocation table, calculation appendices.

Claims and dispute support

Technical delay analysis for court-appointed experts, expert firms, counsel or parties.

  • support to expert firms, including on a white-label basis;
  • specialist assistance to a court-appointed expert in French proceedings (sapiteur);
  • preparation or review of extension of time claims;
  • responses to the other side’s submissions and critiques of opposing expert reports;
  • technical notes for counsel in negotiation, expert determination or arbitration.

Each engagement follows its terms of reference: scope, confidentiality and independence are agreed in writing at the outset.

Scoping a matter

Scope is agreed on the basis of the available records and the procedural timetable.